Building an ADU in Campbell

Campbell's headline perk, the one-week Express Plan Check, is currently suspended, so plan on a standard plan check; the pre-approved plan gallery is still live. Short-term rentals are banned for every ADU, and a unit of 750 sq ft or more pays a park in-lieu fee of about $9,100.

Pre-approved plans

Checked 2026-09-10

AB 1332 gallery on the ADU Accelerator platform, 'free and low-cost plans' from recommended architects; a site-specific permit is still required. Under state law a detached unit built from a pre-approved plan gets a 30-day decision instead of 60.

Program page →

Programs and incentives

  • Suspended

    Express Plan Check

    One-week plan check for simple ADUs, two applicants a week. The city's building page says it is temporarily suspended with no reinstatement date.

    Campbell's page → Checked 2026-09-10
  • Active

    Sample plan sets

    The city publishes sample plan-check sets for a new ADU, a garage conversion, and legalising an existing unit.

    Campbell's page → Checked 2026-09-10
  • Confirm with the city

    Park and impact fee reduction

    Council discussed reducing ADU impact and park fees in August 2025, including full park-fee waivers for affordable units. No adopted change found.

    Campbell's page → Checked 2026-09-10

Local rules worth knowing

  • Maximum size. Detached 1,200 sq ft; minimum 150 sq ft.
  • Height. City bulletin says 16 ft; an older code mirror shows 14 ft and one storey. State law guarantees 16 ft (18 ft near transit). Confirm.
  • Design. Detached ADUs are not subject to the city's residential design standards.
  • Short-term rental. Leases under 30 days are prohibited for all ADUs.
  • JADU. Owner must live in the JADU or the main home; a recorded deed restriction is required before approval.
  • Permit expiry. A building-permit application expires without refund if the permit is not obtained within 180 days.

We build here

Campbell is inside our service area, and ADUs are all we do. We bring in the architect and engineer or work with yours, run the permit with Campbell, and build with our own crew: about 6 weeks of construction for a detached unit once the permit is in hand.

What we can't tell you from here is what your particular lot will take: setbacks, the sewer lateral, the panel, grade and access. That is what the free site walk is for.

Check your address

Free feasibility report based on state, city, and local jurisdictions.

Takes about ten seconds. Nothing is stored unless you ask for the report by email.

Text updates

Replies to your questions, site walk reminders and project status, sent to your phone by Bayfront Contracting (Bayfront ADU). You can stop them at any time.

Leaving the box unchecked is fine, and the form still submits. Consent is not a condition of purchasing or using Bayfront Contracting services. Message frequency varies. Message and data rates may apply. Reply STOP to opt out or HELP for help. Mobile opt-in information is never shared with third parties for their marketing.