How fast your city moves
State law caps the city's response times, and we hold them to it — but a plan checker's queue in August is a plan checker's queue.
Every contractor says they handle everything. What that's worth depends on what's left for you, so this page splits it out phase by phase — what happens, who does it, how long the city gets, and where a schedule genuinely can slip.
A straight answer about what your lot can actually take, before anyone spends money.
You
Bayfront
Timing
One visit. The proposal follows it.
Worth knowing
If your lot is a poor candidate we would rather tell you at this visit than after you have paid for drawings. That happens, and it is not a wasted trip.
We can recommend architects, designers, and engineers or we can work with yours. We'll be there throughout the process either way to make sure everything runs smooth.
You
Bayfront
Timing
Runs on the city's clock, not ours: 15 business days to a completeness determination, 60 days to a decision on a complete application.
Worth knowing
Those are the statutory limits on the city's response, not a promise about the whole phase. Real timelines turn on how fast corrections are cleared — which is exactly why we do not hand that back to you.
One crew, a schedule we manage, and a single point of contact through to your keys.
You
Bayfront
Timing
About 6 weeks of construction for a detached unit — our longest build. Conversions and JADUs run shorter.
Worth knowing
That figure is construction only. It does not include permitting, which happens first, and it does not include waiting for inspection slots. Every unit carries a 12-month warranty from certificate of occupancy.
Three things can move a schedule that no contractor can promise away. We'd rather name them now than explain them later.
State law caps the city's response times, and we hold them to it — but a plan checker's queue in August is a plan checker's queue.
Sewer capacity, soil, and utility runs are found, not predicted. We look hard on the site walk; occasionally the ground still has an opinion.
On a garage conversion, opening up a 1950s slab and roof sometimes reveals work the drawings could not anticipate.
What we do control: a fixed scope, a fixed price, one crew, and a 12-month warranty from certificate of occupancy. A detached unit is about 6 weeks of construction — permitting and inspection scheduling sit outside that, which is why we quote them separately rather than folding them into one reassuring number.
Free, no obligation, and you get a straight answer about what your property can support — including when the answer is that it can't.
Tell us about your lot and what you're hoping to build. We'll follow up to schedule a feasibility walk — no obligation.
Thanks — we've got your request and sent a confirmation to …. A member of our team will reach out shortly to set up your feasibility walk.