Current project

Watch progress on our current projects to get an understanding of how ADUs are built.

Detached ADU · Santa Clara County

Detached ADU, ground-up build

Track progress on our current detached ADU. Custom designed single story unit. Complete ground up build. One bed, one bath, roughly 500 sq ft.

  • Detached, single story
  • One bed, one bath, roughly 500 sq ft
  • Stem-wall foundation, framed floor deck
  • Separate utility rough-in
  • Stucco exterior, black window frames

In progress

About 85% built

CSLB #1131251

Build log

  1. Open grass side yard beside the main house before grading

    01

    The site before grading

    A flat, fenced side yard with room for a detached unit and a clear path for utilities from the main house.

  2. Floor joists framed over a new stem-wall foundation

    02

    Foundation & floor system

    Engineered stem walls poured, then the floor deck framed and squared to the plans.

  3. Plumbing rough-in running through the floor joists

    03

    Utilities roughed in

    Water, waste and electrical set through the joists before the subfloor closed it up.

  4. Walls sheathed in plywood with windows installed

    04

    Framed, sheathed, glazed

    Walls up, roof on, windows flashed and set. Framing inspection passed.

  5. ADU roofed and wrapped in weather barrier, ready for stucco

    05

    Roof and weather barrier

    Roofing on and the building wrapped, ready for lath and stucco.

  6. Finished white stucco ADU with a covered front entry and black window frames
    Gable end of the stucco ADU with a black-framed window
    Side wall of the ADU in fresh stucco, looking toward the entry
    Long wall of the ADU with three black-framed windows in finished stucco
    Rear gable of the stucco ADU with utility stubs at the base

    06

    Stucco finished

    Lath, scratch, brown and finish coats on. Covered entry, black window frames, exposed rafter tails. Grading and paint are next.

  7. Happening now

    07

    Finish work in progress

    Interior finishes, exterior paint and final grading. Next up: final inspections and keys.

  8. Up next

    08

    Key hand-off

    Final inspections signed off, certificate of occupancy issued, and the keys handed to the owner.


Who is building it

Sam Saidian and Brad Pickens are on every job. About us →

Verify us

Look up the contractor licence at CSLB (#1131251). Insurance certificates on request.

Ready to build one?

A free site walk and feasibility check on your lot.

Check your address

Free feasibility report based on state, city, and local jurisdictions.

Text updates

Replies to your questions, site walk reminders and project status, sent to your phone by Bayfront Contracting (Bayfront ADU). You can stop them at any time.

Leaving the box unchecked is fine, and the form still submits. Consent is not a condition of purchasing or using Bayfront Contracting services. Message frequency varies. Message and data rates may apply. Reply STOP to opt out or HELP for help. Mobile opt-in information is never shared with third parties for their marketing.