ADU rules, city by city
State law sets the floor everywhere. This is what each city adds on top: whether it runs a pre-approved plan program, what incentives exist, and the local rules worth knowing before you plan. Every row links to the city's own page, which is the authority.
Last gone over 2026-09-10. Programmes get suspended, capped and restarted; confirm before planning around any of them. Not sure which city permits your lot? Check your address →
| City | Pre-approved plans | Incentives | Local rules worth knowing | Links |
|---|---|---|---|---|
| Campbell Santa Clara County | Yes Program →AB 1332 gallery on the ADU Accelerator platform, 'free and low-cost plans' from recommended architects; a site-specific permit is still required. |
|
| Checked 2026-09-10 |
| Cupertino Santa Clara County | Yes Program →Six plans from four vendors, 476 to 991 sq ft, detached only, valley-floor parcels without geologic hazards. Standard fees apply. |
|
| Checked 2026-09-10 |
| East Palo Alto San Mateo County | None we know of | — | — | Checked 2026-08-25 |
| Gilroy Santa Clara County | Yes Program → | — | Also publishes a path for legalizing unpermitted ADUs and JADUs. | Checked 2026-08-25 |
| Los Altos Santa Clara County | Yes Program →Nine free city permit-ready detached plan sets (three styles, 525 / 854 / 1,190 sq ft) with full structural and MEP drawings, plus private pre-approved plans. |
| Checked 2026-09-10 | |
| Los Altos Hills Santa Clara County | Yes Program → | — | Publishes pre-approved plans already cleared by California HCD, plus a cost calculator. Plans still need a siting conversation with planning, but get a streamlined review. | Checked 2026-08-25 |
| Los Gatos Santa Clara County | Yes Program →AB 1332 gallery on the ADU Accelerator platform; modifications to pre-approved plans are not allowed. |
|
| Checked 2026-09-10 |
| Milpitas Santa Clara County | Yes Program →For new detached units: reduced plan-review fee and turnaround cut by as much as half. |
|
| Checked 2026-09-10 |
| Monte Sereno Santa Clara County | Yes Program → | — | The City Council approved a 50% reduction in building permit and plan check fees for a new ADU, including conversions of an existing pool house or garage. | Checked 2026-08-25 |
| Morgan Hill Santa Clara County | None we know of | — | — | Checked 2026-08-25 |
| Mountain View Santa Clara County | Yes Program →Detached, new-construction plans pre-approved for local building, fire and Reach Code compliance, published on the city's ADU Accelerator gallery. |
| Checked 2026-09-10 | |
| Palo Alto Santa Clara County | Yes Program →Pre-approved detached designs on the ADU Accelerator gallery; a gallery plan removes the architectural review of the structure, and a site-specific building permit is still required. |
|
| Checked 2026-09-10 |
| San José Santa Clara County | Yes Program →City-reviewed plans from 30+ vendors. With a complete site-specific package the permit may issue the same day as the plan-review appointment. |
| Checked 2026-09-10 | |
| Santa Clara Santa Clara County | Yes Program →Building Division program (revised April 2026): plan review at 25% of the standard fee and a 10-business-day first review for unchanged pre-approved plans. |
| Checked 2026-09-10 | |
| Saratoga Santa Clara County | Yes Program →Detached plans pre-reviewed for building-code consistency; complete site-specific submittals deemed complete within 30 days. Check parcel eligibility on the city's GIS tool first. |
| Checked 2026-09-10 | |
| Sunnyvale Santa Clara County | Yes Program →Pre-approved plans gallery on the county's ADU Accelerator platform; plans are bought from the designer and get a streamlined review. |
| Checked 2026-09-10 | |
| Unincorporated Santa Clara County Santa Clara County | Yes Program →County-owned plans free of charge: 800 sq ft two-bed and 1,200 sq ft three-bed, each in two styles. Staff review only the site-specific items (about four weeks first review, two on resubmittal). Not usable in WUI, flood or geologic-hazard zones. |
| Checked 2026-09-10 |
The floor under every row
None of the cities above can go under these. Full guide, with the statute cited →
An ADU is allowed on your lot
Every lot zoned for residential use may have at least one ADU, and a single-family lot may also add a JADU. A city cannot say no to the category.
800 sq ft by right
A detached or attached unit of up to 800 sq ft, 16 ft tall, with 4 ft side and rear setbacks must be approved regardless of local lot-coverage or floor-area limits.
Four-foot setbacks
A city cannot require more than four feet from side and rear lot lines for an ADU.
A 60-day decision
Once your application is complete the city has 60 days to approve or deny; 30 if you build from a pre-approved plan.
No replacement parking
Convert or demolish a garage to build an ADU and the spaces you lose never have to be replaced.
No impact fees under 750 sq ft
Prohibited entirely below 750 square feet, and proportional above it.
Ministerial review
Reviewed against an objective checklist. No design review board, no hearing, no discretion about whether they like it.
No owner-occupancy rule for an ADU
A city cannot require you to live on the property for a standard ADU. A JADU is different: since 1 January 2026 owner occupancy is required when the JADU shares sanitation with the main house.