Building an ADU in Sunnyvale

The lever is the 800 sq ft line: a detached unit under 800 sq ft on a single-family lot is building-permit-only, while 800 sq ft and up needs a Miscellaneous Plan Permit and replacement of any uncovered parking removed. Size caps sit below the state default.

Pre-approved plans

Checked 2026-09-10

Pre-approved plans gallery on the county's ADU Accelerator platform; plans are bought from the designer and get a streamlined review. Under state law a detached unit built from a pre-approved plan gets a 30-day decision instead of 60.

Program page →

Programs and incentives

  • Active

    Building-permit-only path under 800 sq ft

    Interior conversions and new detached units under 800 sq ft on single-family lots need a building permit only, with no planning approval.

    Sunnyvale's page → Checked 2026-09-10
  • Active

    Five-year deferred enforcement for pre-2020 units

    Owners of an unpermitted ADU built before 2020 can request five-year deferred enforcement while life-safety items are verified.

    Sunnyvale's page → Checked 2026-09-10

Local rules worth knowing

  • Maximum size. New detached or attached units: 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more bedrooms). Interior conversions have no maximum. Source →
  • Height. Detached 16 ft, or 18 ft near transit. Attached up to 25 ft or the main home's height, whichever is lower.
  • Parking. None required, except a detached unit of 800 sq ft or more must replace uncovered spaces it removes.
  • JADU. Up to 500 sq ft inside the walls of the house; owner occupancy required.
  • Short-term rental. Only ADUs built before 2020 may be used as short-term rentals; everything since is 30-day minimum.

We build here

Sunnyvale is inside our service area, and ADUs are all we do. We bring in the architect and engineer or work with yours, run the permit with Sunnyvale, and build with our own crew: about 6 weeks of construction for a detached unit once the permit is in hand.

What we can't tell you from here is what your particular lot will take: setbacks, the sewer lateral, the panel, grade and access. That is what the free site walk is for.

Check your address

Free feasibility report based on state, city, and local jurisdictions.

Takes about ten seconds. Nothing is stored unless you ask for the report by email.

Text updates

Replies to your questions, site walk reminders and project status, sent to your phone by Bayfront Contracting (Bayfront ADU). You can stop them at any time.

Leaving the box unchecked is fine, and the form still submits. Consent is not a condition of purchasing or using Bayfront Contracting services. Message frequency varies. Message and data rates may apply. Reply STOP to opt out or HELP for help. Mobile opt-in information is never shared with third parties for their marketing.