Building an ADU in San José

The most built-out ADU apparatus in the county: a dedicated ADU Ally team, an ADU permit service with same-day issuance for pre-approved plans, a 30-plus vendor pre-approved catalog, and the first ADU condominium sale in California under AB 1033.

Pre-approved plans

Checked 2026-09-10

City-reviewed plans from 30+ vendors. With a complete site-specific package the permit may issue the same day as the plan-review appointment. Under state law a detached unit built from a pre-approved plan gets a 30-day decision instead of 60.

Program page →

Programs and incentives

  • Active

    Same-day permits for pre-approved plans

    Pre-approved-plan projects go through the Permit Center's ADU service; the permit may issue the same day as the plan-review appointment when the site-specific submittal is complete.

    San José's page → Checked 2026-09-10
  • Active

    AB 2533 legalization path

    Penalty-free path to legalise an ADU or JADU built without permits before 1 January 2020. Apply through the ADU Ally team. The city's own earlier amnesty window closed in January 2022.

    San José's page → Checked 2026-09-10

Local rules worth knowing

  • Local standards. The city says its zoning code enacts state ADU law and its ADU Universal Checklist reflects it (Municipal Code 20.30.150). No city-specific dimensional standards beyond state law could be verified.
  • Sold separately. First California city to implement AB 1033: an ADU may be converted to a condominium and sold separately from the main home.
  • Separate meter. PG&E now requires a new ADU to have its own meter (JADUs do not). The site plan must show the sewer point of connection.
  • Trees. Removing an ordinance-size tree (38 in circumference at 4.5 ft, single or combined trunks) on a single-family lot needs a tree removal permit.
  • Tiny homes on wheels. Permitted as a type of ADU on single-family lots, with a simpler, lower-cost permit process.
  • Short-term rental. Minimum rental term is 30 days.

We build here

San José is inside our service area, and ADUs are all we do. We bring in the architect and engineer or work with yours, run the permit with San José, and build with our own crew: about 6 weeks of construction for a detached unit once the permit is in hand.

What we can't tell you from here is what your particular lot will take: setbacks, the sewer lateral, the panel, grade and access. That is what the free site walk is for.

Check your address

Free feasibility report based on state, city, and local jurisdictions.

Takes about ten seconds. Nothing is stored unless you ask for the report by email.

Text updates

Replies to your questions, site walk reminders and project status, sent to your phone by Bayfront Contracting (Bayfront ADU). You can stop them at any time.

Leaving the box unchecked is fine, and the form still submits. Consent is not a condition of purchasing or using Bayfront Contracting services. Message frequency varies. Message and data rates may apply. Reply STOP to opt out or HELP for help. Mobile opt-in information is never shared with third parties for their marketing.