Building an ADU in Saratoga

ADUs go over the counter with no hearing, and the pre-approved detached plans (with a WUI-compliant filter) are the fastest lane. Hillside, fault, liquefaction and fire-zone parcels on the west side get pulled into geotechnical and fire review.

Pre-approved plans

Checked 2026-09-10

Detached plans pre-reviewed for building-code consistency; complete site-specific submittals deemed complete within 30 days. Check parcel eligibility on the city's GIS tool first. Under state law a detached unit built from a pre-approved plan gets a 30-day decision instead of 60.

Program page →

Programs and incentives

  • Active

    All city fees waived for deed-restricted affordable units

    ADUs and JADUs deed-restricted to below-market-rate households are exempt from all planning, building and engineering permit fees (fee schedule effective January 2026).

    Saratoga's page → Checked 2026-09-10

Local rules worth knowing

  • Maximum size. 1,200 sq ft attached or detached; JADU 500 sq ft inside the home.
  • Height. Detached 16 ft on single-family lots, 18 ft on multi-family; attached up to 25 ft or the main-dwelling limit.
  • Coverage. An 800 sq ft unit may exceed the lot's maximum floor area and site coverage.
  • Fire and hillside. Very High Fire Hazard Severity Zones cover the western hillsides; hillside, liquefaction and fault parcels need site-specific geotechnical review. Sprinklers only if the main home requires them.
  • Short-term rental. Under 30 days prohibited; units cannot be sold separately.
  • Ordinance status. HCD's December 2025 letter notes the ordinance on file is from 2020 and may be out of compliance; state law controls where stricter.

We build here

Saratoga is inside our service area, and ADUs are all we do. We bring in the architect and engineer or work with yours, run the permit with Saratoga, and build with our own crew: about 6 weeks of construction for a detached unit once the permit is in hand.

What we can't tell you from here is what your particular lot will take: setbacks, the sewer lateral, the panel, grade and access. That is what the free site walk is for.

Check your address

Free feasibility report based on state, city, and local jurisdictions.

Takes about ten seconds. Nothing is stored unless you ask for the report by email.

Text updates

Replies to your questions, site walk reminders and project status, sent to your phone by Bayfront Contracting (Bayfront ADU). You can stop them at any time.

Leaving the box unchecked is fine, and the form still submits. Consent is not a condition of purchasing or using Bayfront Contracting services. Message frequency varies. Message and data rates may apply. Reply STOP to opt out or HELP for help. Mobile opt-in information is never shared with third parties for their marketing.