Building an ADU in Los Altos

The most generous city on paper: ADU building-permit, plan-check and MEP fees are all $0 in the FY2026-27 schedule, and the city gives away nine permit-ready detached plan sets. The trade-offs are a 16 ft one-storey cap on detached units in the code, a daylight plane, and a recorded deed restriction on every ADU.

Pre-approved plans

Checked 2026-09-10

Nine free city permit-ready detached plan sets (three styles, 525 / 854 / 1,190 sq ft) with full structural and MEP drawings, plus private pre-approved plans. Under state law a detached unit built from a pre-approved plan gets a 30-day decision instead of 60.

Program page →

Programs and incentives

  • Active

    $0 ADU permit and plan-check fees

    FY2026-27 fee schedule (effective 1 July 2026): ADU building permit, plan check, and electrical, mechanical and plumbing permits all $0. Construction tax and outside-agency fees still apply.

    Los Altos's page → Checked 2026-09-10
  • Active

    Free permit-ready plan sets

    Nine detached plan sets in three styles and three sizes, including structural, mechanical, electrical and plumbing drawings.

    Los Altos's page → Checked 2026-09-10

Local rules worth knowing

  • Maximum size. Detached 850 sq ft (one bedroom) or 1,200 sq ft (two or more), basement included, garage excluded; attached units also capped at 50% of the main home.
  • Height. Code: detached one storey and 16 ft. The city's information guide lists 18 ft; state law allows 18 ft near transit. Confirm with planning.
  • Daylight plane. 8 ft at the property line rising at 6:12; 5 ft separation from the main home and other structures (waived if it would block an 850 sq ft unit).
  • Deed restriction. Every ADU records a deed restriction barring short-term rental and separate sale before the building permit issues.
  • JADU. Owner must live in the main home or the JADU; deed restriction required; no separate utility connection or fee.
  • Parking. One uncovered space for a new-construction ADU unless a state exemption applies.
  • Ordinance vintage. Chapter 14.14 is the 2020 ordinance and still cites the old code sections; state changes since then control where more permissive.

We build here

Los Altos is inside our service area, and ADUs are all we do. We bring in the architect and engineer or work with yours, run the permit with Los Altos, and build with our own crew: about 6 weeks of construction for a detached unit once the permit is in hand.

What we can't tell you from here is what your particular lot will take: setbacks, the sewer lateral, the panel, grade and access. That is what the free site walk is for.

Check your address

Free feasibility report based on state, city, and local jurisdictions.

Takes about ten seconds. Nothing is stored unless you ask for the report by email.

Text updates

Replies to your questions, site walk reminders and project status, sent to your phone by Bayfront Contracting (Bayfront ADU). You can stop them at any time.

Leaving the box unchecked is fine, and the form still submits. Consent is not a condition of purchasing or using Bayfront Contracting services. Message frequency varies. Message and data rates may apply. Reply STOP to opt out or HELP for help. Mobile opt-in information is never shared with third parties for their marketing.