Building an ADU in Palo Alto

A two-track code: take the state baseline (800 sq ft, 16 to 18 ft) with no strings, or opt into city standards that allow 900 to 1,000 sq ft and up to 800 sq ft above your FAR and lot-coverage caps in exchange for a set of privacy rules. Impact fees are real money above 750 sq ft; the city's own estimate runs $10,000 to $80,000.

Pre-approved plans

Checked 2026-09-10

Pre-approved detached designs on the ADU Accelerator gallery; a gallery plan removes the architectural review of the structure, and a site-specific building permit is still required. Under state law a detached unit built from a pre-approved plan gets a 30-day decision instead of 60.

Program page →

Programs and incentives

  • Active

    Larger units under city standards

    900 sq ft (one bedroom) or 1,000 sq ft (two or more), plus up to 800 sq ft above FAR and lot coverage, in exchange for privacy standards on entry orientation, window sills, deck screening and lighting.

    Palo Alto's page → Checked 2026-09-10
  • Active

    Impact-fee exemptions

    Units under 750 sq ft, JADUs, and garage or carport conversions with no FAR expansion are exempt from development impact fees (FY26 fee sheet).

    Palo Alto's page → Checked 2026-09-10

Local rules worth knowing

  • State track. 800 sq ft, 16 ft (18 ft near transit, plus 2 ft to match the main roof pitch), 4 ft side and rear setbacks.
  • City track. 900 or 1,000 sq ft; up to 25 ft in the RE zone; at least 3 ft from the main home; additional city standards apply.
  • Privacy standards. Entry facing a different property line than the main home's; obscured glazing on egress windows facing neighbours; sill-height and deck-screening rules; downward lighting.
  • Parking. None required for a new second unit.
  • Short-term rental. 30-day minimum for any ADU or JADU.
  • Special districts. Flood zone, historic district or listed historic properties may face extra requirements; check the property information map.
  • Ordinance status. HCD issued 20 findings on the 2024 ordinance; whether Council adopted amendments in 2025 could not be confirmed from city sources.

We build here

Palo Alto is inside our service area, and ADUs are all we do. We bring in the architect and engineer or work with yours, run the permit with Palo Alto, and build with our own crew: about 6 weeks of construction for a detached unit once the permit is in hand.

What we can't tell you from here is what your particular lot will take: setbacks, the sewer lateral, the panel, grade and access. That is what the free site walk is for.

Check your address

Free feasibility report based on state, city, and local jurisdictions.

Takes about ten seconds. Nothing is stored unless you ask for the report by email.

Text updates

Replies to your questions, site walk reminders and project status, sent to your phone by Bayfront Contracting (Bayfront ADU). You can stop them at any time.

Leaving the box unchecked is fine, and the form still submits. Consent is not a condition of purchasing or using Bayfront Contracting services. Message frequency varies. Message and data rates may apply. Reply STOP to opt out or HELP for help. Mobile opt-in information is never shared with third parties for their marketing.