Pre-approved plans
Checked 2026-09-10For new detached units: reduced plan-review fee and turnaround cut by as much as half. Under state law a detached unit built from a pre-approved plan gets a 30-day decision instead of 60.
Program page →Compare cities · Santa Clara County
The only city currently paying homeowners' permit fees, with money the city expects to run out by the end of 2026. It also layers more design rules than its neighbours: matching materials and roof pitch, side or rear entrances, down-lighting, screening, and a 50% lot-coverage cap.
Most cities in Santa Clara County make building an ADU possible. Milpitas has spent several years actively paying people to do it, and it runs a second programme aimed squarely at owners of units that were built without permits. If you own property in Milpitas, these are worth understanding before you plan anything else, because they change the arithmetic more than any design decision will.
For new detached units: reduced plan-review fee and turnaround cut by as much as half. Under state law a detached unit built from a pre-approved plan gets a 30-day decision instead of 60.
Program page →Covers city permit costs on eligible ADU and JADU projects on single-family and duplex lots, averaging about $5,000 per unit. Reinstated with Community Investment Fund money; the city projects funds exhausted by end of 2026. School fees over 750 sq ft and utility connections are excluded.
A path to legalise units or conversions built without permits: anonymous self-assessment, a consultation with no name or address required until scheduling, then a courtesy inspection. Dovetails with AB 2533.
Roughly halves the target turnaround, subject to staff availability.
Milpitas subsidises the permit fees on a new ADU — the city puts the average at around $5,000 a unit. The programme was originally funded with federal ARPA money, ran from March 2022, and closed in February 2024 when that funding was exhausted. It has since been reactivated, and the city projects the current funding will be fully disbursed by the end of 2026. That makes it genuinely time-limited rather than a standing benefit: the money runs out when it runs out.
If a garage was converted or a unit built without permits — often by a previous owner — Milpitas runs a dedicated path to legalise it rather than penalise it. It covers conversions of garages, rooms and existing structures as well as units built new without a permit, and it dovetails with the state's AB 2533 amnesty for unpermitted ADUs constructed before January 2020. The city publishes its own AB 2533 fact sheet alongside it.
Milpitas also publishes pre-approved ADU plans. Building a detached unit from one drops the city's decision clock from 60 days to 30 under state law — and that clock accepts a plan pre-approved by any agency in California, not only Milpitas's own.
State law sets a floor no ordinance can go under. The full guide, with every statute cited →
Every lot zoned for residential use may have at least one ADU, and a single-family lot may also add a JADU. A city cannot say no to the category.
A detached or attached unit of up to 800 sq ft, 16 ft tall, with 4 ft side and rear setbacks must be approved regardless of local lot-coverage or floor-area limits.
A city cannot require more than four feet from side and rear lot lines for an ADU.
Once your application is complete the city has 60 days to approve or deny; 30 if you build from a pre-approved plan.
Convert or demolish a garage to build an ADU and the spaces you lose never have to be replaced.
Prohibited entirely below 750 square feet, and proportional above it.
Reviewed against an objective checklist. No design review board, no hearing, no discretion about whether they like it.
A city cannot require you to live on the property for a standard ADU. A JADU is different: since 1 January 2026 owner occupancy is required when the JADU shares sanitation with the main house.
Milpitas is inside our service area, and ADUs are all we do. We bring in the architect and engineer or work with yours, run the permit with Milpitas, and build with our own crew: about 6 weeks of construction for a detached unit once the permit is in hand.
What we can't tell you from here is what your particular lot will take: setbacks, the sewer lateral, the panel, grade and access. That is what the free site walk is for.
Tell us about your lot and what you're hoping to build. We'll follow up to schedule a feasibility walk — no obligation.
Thanks — we've got your request and sent a confirmation to …. A member of our team will reach out shortly to set up your feasibility walk.