Building an ADU in Cupertino

Cupertino rewrote its ADU chapter in September 2025 after HCD rejected the 2024 version, so the rules are cleaner than most neighbours: up to three ADUs on a single-family lot in any mix, and an 800 sq ft unit gets 18 ft of height and ignores FAR, coverage and open-space limits. Past 800 sq ft, the 45% FAR and the usual rules return.

Pre-approved plans

Checked 2026-09-10

Six plans from four vendors, 476 to 991 sq ft, detached only, valley-floor parcels without geologic hazards. Standard fees apply. Under state law a detached unit built from a pre-approved plan gets a 30-day decision instead of 60.

Program page →

Programs and incentives

  • Active

    Impact-fee exemption under 750 sq ft

    No park, storm drain or school impact fees under 750 sq ft; proportional above (CMC 19.112.020(C)).

    Cupertino's page → Checked 2026-09-10
  • Active

    Legalisation of pre-2020 units

    Codified AB 2533 path: a permit to legalise a pre-2020 unit may not be denied for code non-compliance unless a substandard-building correction is needed. No fee waiver stated.

    Checked 2026-09-10

Local rules worth knowing

  • Streamlined units up to 800 sq ft. 4 ft setbacks, 18 ft detached height (+2 ft near transit), second storey allowed, exempt from FAR, coverage and open space.
  • Larger units. 850 sq ft (studio or one bedroom) or 1,000 sq ft (two or more); attached capped at 50% of the main home; FAR, coverage and open space per zoning; second storey only within half a mile of transit.
  • Up to three ADUs. A single-family lot may hold up to three ADUs in any combination.
  • Design. Access on a different wall plane than the main entrance; extra standards in Eichler, Monta Vista, hillside and planned-development areas.
  • Short-term rental. 30-day minimum for any ADU including a JADU; may be rented but not sold separately.
  • JADU. 500 sq ft within the existing house (not a garage), may share a bathroom, owner occupancy required.
  • Addresses and SB 9. Detached units get their own address; no ADU on an SB 9 split lot with units approved under that path.

We build here

Cupertino is inside our service area, and ADUs are all we do. We bring in the architect and engineer or work with yours, run the permit with Cupertino, and build with our own crew: about 6 weeks of construction for a detached unit once the permit is in hand.

What we can't tell you from here is what your particular lot will take: setbacks, the sewer lateral, the panel, grade and access. That is what the free site walk is for.

Check your address

Free feasibility report based on state, city, and local jurisdictions.

Takes about ten seconds. Nothing is stored unless you ask for the report by email.

Text updates

Replies to your questions, site walk reminders and project status, sent to your phone by Bayfront Contracting (Bayfront ADU). You can stop them at any time.

Leaving the box unchecked is fine, and the form still submits. Consent is not a condition of purchasing or using Bayfront Contracting services. Message frequency varies. Message and data rates may apply. Reply STOP to opt out or HELP for help. Mobile opt-in information is never shared with third parties for their marketing.